Skip to main content

mathilda

Certification and sourcing of an electric snowbike

Certification and sourcing for an electric snowbike

By Certification, Sourcing, Use case

Certification and sourcing support for Moonbikes

Moonbikes has developed the first electric snowmobile designed to facilitate travel in Alpine environments. For Moonbikes, we provided expertise in sourcing and regulatory analysis to facilitate product export.

Certification and sourcing of an electric snowbike

Kickmaker helped us define the regulatory framework applicable to our product, which in turn enabled us to identify areas for development and assess the risks to which we were exposed.

Vincent DouilletVP Engineering & Industrial MoonBikes

Certification and sourcing for a structured project

Project summary:

  • Sourcing and expertise in regulatory analysis to ensure export to North America (their main market)
  • Identification of products and partners meeting the product’s technical and normative requirements
  • Implementation of a complete certification scheme for North America and Europe
  • Sourcing of suppliers for batteries and controllers meeting normative requirements.

Results and differentiators :

  • Successful certification for North American and European markets (UL, CE, FEM)
  • Selection of partners and products complying with technical and regulatory standards
  • Secure supply of quality batteries and controllers
Work with us

Turn your project into an industrial success!

Sign-up today!

And don’t miss our tech & industry news

Product design and sourcing : LeChiller

By Indus, Use case

Product design and sourcing

LECHILLER concept develop a cooling system for beverages. The system refrigerates glycol mixed with water in a tank at -35C. The bottles are inserted in a pocket that’s submerged in the mix so they aren’t in contact with the liquid. 

Le chiller product design and sourcing Kickmaker
Le chiller product design and sourcing Kickmaker

“We needed to redesign and industrialize a complete range of wine bottle coolers”.

THE PROJECT AND ITS CHALLENGES

Le Chiller’s objective was to rework a new version of its beverage cooling system.

Le Chiller was therefore looking for an external engineering partner to accompany it on its V2 project. The requirements were based on product and software design and sourcing.

For Le Chiller, Kickmaker carried out the following tasks:

  • Product design in collaboration with Elium Studio
  • Research and identification of manufacturers
  • Updating the design of the old version
  • New factory in Europe
Work with us

Let's work on your project!